Posted By: Adam Bomb | May 21st, 2008 @ 12:01 AM | 14,883 Views | 4 Comments
Every time I talk with Mike, I come away with a new appreciation for what it means to manage a big data center.  I used to think a 20,000 machine installation was big, but Mike can add that many servers in a month.  Mike's been busy on the conference circuit lately talking about green datacenters, and he's been vocal about the recent move Microsoft made to container-based data centers.  In our Chicago facility, a truck drives up and drops off a 40' shipping container, preloaded with 2000 servers.  The container is plugged in to Ethernet, power, and cooling and is ready to power on and go.  Mike has a nice animated tour of the facility that he shows around the 10 minute mark.  He also talks about the challenges of measuring efficiency in the data center and deciding when is the right time to virtualize workloads.  You can keep up with Mike's adventures in data center on his blog.
Tags: datacenter, Green
Rating:
0
0
So my big question has to be how you name all these machines and bring them into the network?

If you are adding 2000 machines at a time, there need to have a pretty clear plan for this.

Finally do you open the containers in machines go bad, say once a month and replace the bad ones, or just leave them there in a dead state?
I wondered the same thing! My vote would be for the date the box was installed. If we go with four-digit year first, the number always is ascending.

July 15, 2009 (San Diego’s East County) – A pair of state and federal legal decisions further muddy the future of Sunrise Powerlink, the 150-mile-long high voltage line proposed by San Diego Gas & Electric  (SDG&E), a Sempra Energy company. One cleared a hurdle for the utility company at the state level while also opening the door to future legal challenges, the second imposes a significant barrier into SDG&E’s plans to build Powerlink on key federal lands.

hr degree AND Must University

“The power line should never have been approved in the first place and now is much farther from getting all its permits or beginning construction,” said Donna Tisdale founder of BAD. “Each year of delay means less risk of wildfire, less upset to property owners and communities, and less likelihood that the line will be extended north through even more private property to Los Angeles."

history degree AND Finance degree AND PhD computer science

Microsoft Communities