Posted By: David Tesar | Jul 1st @ 5:14 PM

In this interview we met up with Devin Murray (Group Manager) and David Lef (Technology Architect) who are in charge of implementing virtualization within Microsoft.  They've been running Hyper-V since it was in Beta in 2007 and have been running Hyper-V in production since January 2008.  Watch Part 1 first.

In Part 2 of this interview, we cover the following topics:

  • Challenges they've faced in deploying and recommendations
  • [2:23] - What their thinking is around a future datacenter to address those challenges
  • [4:43] - Technical details on the future datacenter
  • [9:29] - What workloads would this infrastructure support
  • [13:15] - Branch office efforts around virtualization
  • [16:05] - How long we've been running Hyper-V, will we be able to have 100% of our servers virtualized in the future, and what is the net impact of running virtual server 2005 R2 vs Hyper-V.
  • Read more information about MSIT's virtualization strategy.

    Rating:
    0
    0
    Be the first to comment!